Home Search

Building the Bearhawk LSA - search results

If you're not happy with the results, please do another search

Building the Bearhawk LSA

0
...sets fit the Bearhawk perfectly—Rion and I had plenty of riveting experience, and the Bearhawk uses a riveted aluminum wing. Phillip had been through two tube-and-rag airplanes, and the Bearhawk...

Building the Bearhawk LSA

0
...the very aft end of the fuselage and working forward. That meant building the tail surfaces and getting them mounted, supported, and functioning. The tail surfaces of the Bearhawk LSA...

Building the Bearhawk LSA

0
...wing is installed. As you might remember from the last exciting episode, the Pudding River Bearhawk crew was closing in—however slowly—on completing their Bearhawk LSA. Well…remember how Charles Schultz’s cartoon...

Building the Bearhawk LSA

0
...altogether (Fiesler Natter)—nothing better has come along, so the Pudding River Bearhawk has wheels. Three of them: a little one in the back and two bigger ones (just how much...

Building the Bearhawk LSA

1
When we finally came to the noisy end of the airplane, we had some decisions to make. The Bearhawk LSA is designed around a small four-cylinder Continental engine, although there...

Building the Bearhawk LSA

1
...neighbors, Phillip Groelz, Rion Bourgeois, and I, with occasional help from Rion’s son Elliot, combined our tools and energies to begin building a Bearhawk LSA. It’s a two-seat tandem design...

Building the Bearhawk LSA

3
...to contemplate our next step. Now that the major sheet metal assemblies of the Bearhawk LSA were behind us, Rion and I were truly out of our comfort zone as...

Building the Bearhawk LSA

0
...opinion from Steve Harris, who’d used Oratex on his four-place Bearhawk. Philip Groelz, on the left, and Rion Bourgeois install Oratex fabric on the aft fuselage. The completed control surfaces...

Building the Bearhawk LSA

1
...ForeverHawk, our six-year and two-week Bearhawk LSA project, was ready to fly. The scales said the empty weight was 836 pounds, including oil and three quarts of unusable fuel. The...

Building the Bearhawk LSA

0
...Bearhawk LSA is covered with, or constructed from, sheet metal. There’s a firewall, belly skins, cockpit floors and fuselage side skins. The cowling is all sheet metal too, as is...

In Case You Missed it

Yearly Condition Inspection, Part I

2
If you own a Cessna or other certificated airplane, you need to get an...

Two Flash or Not Two Flash

20
Building a double-flash LED strobe system.

Sport: Air Racing’s New Beginning

2
With the catastrophic elimination of Reno-Stead Airport as a racing venue this coming September,...

Aero ‘lectrics

0
This month, author Jim Weir lays the groundwork for a solar battery charger, complete with preliminary circuit board considerations drawn from a rats nest and details about how to order a pre-fabricated board.